Project Description
Do You Have A Construction Project We Can Help With?
Grundon Waste
Contracted by Britannia Construction to replace a 1600 SQM life expired FRC slab and 300 SQM of RC ramps at Grundon’s Waste transfer Station, Slough.
Project Details
DATE
March 20, 2020